Risk
Risk matrix
A grid that rates risks by how likely they are and how bad they would be.
What it is for
A risk matrix, or heat map, gives every risk a likelihood and an impact, and the combination gives it a rating. It is a quick way to compare risks, to decide which need action, and to show senior people the shape of the risk picture on one page.
How it works
- Describe each risk as an event and its effect.
- Agree a scale for likelihood and a scale for impact, with plain definitions.
- Place each risk on the grid.
- Decide the response for each rating: accept, reduce, transfer or avoid.
- Give each risk an owner and a review date.
- Re-plot after the controls are in place to see whether the rating has really changed.
When not to use it
Ratings are judgements and can hide a lot. Two risks in the same square can need very different handling, and a rare but severe event can look safer than it is. Always write the rating as a word as well as a colour, and do not average scores across risks.
Often used with
Bow tie diagram and Pre-mortem. Or see everything in the Toolkit.